Services
- Planning of new and / or revised complete EPS / EPP production plants with central monitoring and control functions of the individual care groups so that guaranteed a constant medias (steam, compressed air, water, recooling, etc.) on is demand
- Rebuilding and optimization of existing EPS, EPP molding machines and block molding machines. By the rebuilding and programming is possible a reduction in the steam consumption of 20 to 40% and the cycle time from 25 to 50% depending on the design and / or tool
The rebuilding measures of shape molding machines include:
- as necessary revision of the mechanical structure
- PLC control according to our standard
- complete pneumatic control (control valves, pneumatic lines etc.)
- reprogramming
- start-up and training on site for settlement of direct costs